More British Defence Cuts Coming Soon?


Various media outlets have recently been reporting that the British Ministry Of Defence will have to make significant additional cuts in the near future.

These cuts will be on top of the significant reductions announced in the Strategic Defence and Security Review in October 2010.

The Financial Times reports that there is a shortfall of at least £1,000 Million a year in the defence budget.


It is difficult to know whether these reports are correct given the media's history of inaccuracy on defence matters.

However,if they are correct,there will need to be substantial cuts.


David Cameron personally took the decision to eliminate the United Kingdom's ability to independently conduct combat operations when he chose to cut the Harrier fleet and retain the Tornados.





"In terms of cost, if we remove the Tornado force, we would be looking at (saving) about £7.5 billion by 2018.
With the Harriers, we are looking at less than £1 billion."

That additional saving of £6,500 Million over the 7 years to 2018 equates to an average saving of £928 Million a year.
David Cameron's personal decision to retain the Tornado fleet appears to be the direct cause of the latest financial crisis at the Ministry Of Defence.


At least,if there is another financial crisis.
Reversing that decision is still possible.
Not only would that save a great deal of money but it would also restore the United Kingdom's ability to independently conduct war fighting operations.
Without that ability the British armed forces cannot serve the interests of the British taxpayer.
Making them little more than an expensive vanity project.

Another of the Strategic Defence and Security Review's strange omissions was the decision not to cut the obvious overcapacity in the Future Strategic Tanker Aircraft project.
These aircraft will cost a minimum of £441 Million a year over the contract's 27 year life from 2008 to 2035,over £497 Million for each of the 24 years the new tankers will be in service from 2011 to 2035 or £627 Million for each of the 19 years of full operating capability from 2016 to 2035.
It is difficult to see any need for more than half of the 14 A330 aircraft provided under this contract.
Had Future Strategic Tanker Aircraft been cut to an appropriate size in October hundreds of millions of pounds a year would have been saved.

Another obvious saving would be to cancel the badly thought out Future Rapid Effects System (F.R.E.S.),or what remains of it.
Not only would this save the British Army from being lumbered with an unsuitable vehicle for the next 50 years but it would also eliminate the damage to the economy caused by buying thousands of millions of pounds worth of foreign made ASCOD armoured vehicles.
A far cheaper option is upgrading the very similar and already in service Warrior vehicles (a direct equivalent of ASCOD).
The British Army could then get a more suitable,less economically damaging and more exportable,domestically designed and built modern armoured personnel carrier at a later date.
A type of vehicle which would be in high demand on the export market but which is not currently available anywhere.
The alternative is being stuck with a sexed up 1990s era infantry fighting vehicle with a flat bottom and hull penetrating torsion bar suspension until 2060.
A new armoured personnel carrier design with shallow vee hull and non hull penetrating suspension,capable of carrying 2 pallets or 8 infantrymen in addition to it's 2 man crew,would allow the British Army to reduce it's frontline vehicle fleet to just 3 major types (light,medium and heavy) in the medium term.
Most importantly,cancelling F.R.E.S. Scout/ASCOD would eliminate the threat to the British Army's security of supply caused by a reliance on foreign countries which are often opposed to British military operations.
Armed forces without security of supply cannot serve the interests of the people who pay for them.
There is no reason for the taxpayer to pay for armed forces which can not serve his best interests.
The Americans had the good sense to kill off the Future Combat Systems vehicles.
Perhaps the current financial situation will save the British Army from Future Rapid Effects System.

Wednesday, 19 January 2011

Aerial Refuelling Demand:By The Numbers


We pointed out that demand for tanker aircraft was declining significantly while F.S.T.A. was committing the British taxpayer to fund massive overcapacity at vast expense until 2035.

We suggested that Britain needed only 6 or 7 A330 tanker transport aircraft.

We also suggested that these should have been bought outright.

We did not go into detail about that number.

We shall do so here.



The cost to the taxpayer of the air refuelling fleet is defined by the capacity which must be maintained in peacetime.

The air refuelling capacity must satisfy peak air refuelling demand.

Peak air refuelling demand occurs during major war fighting operations.

The last time Britain was engaged in a major war fighting operation was during the 2003 invasion of Iraq,known as Operation Telic or Iraqi Freedom.

Developments in weapons and sensors,the Royal Navy's new aircraft carriers,reductions in the size of British military aircraft fleet and longer ranged aircraft entering service all suggest that future peak air refuelling demand will be significantly less than it was in 2003.


Let us look at what was needed in 2003.



The United States Air Force (U.S.A.F.) publication "Operation IRAQI FREEDOM – By The Numbers" gives statistics for the 31 days of the air war during the Iraq invasion.

It says that the Royal Air Force deployed 12 air refuelling tankers for Operation Telic/Iraqi Freedom,these flew 359 sorties and offloaded  18,884,000 pounds of fuel.

The latter figure is listed under the phrase "coalition" but as no other coalition country is listed as providing aerial refuelling aircraft this must presumably have been delivered by the Royal Air Force.


In Chapter 6 of a "Short History of the Royal Air Force","RETURN TO EXPEDITIONARY WARFARE",the following figures were given for the British aerial refuelling effort during the Iraq invasion:


"The AAR (Air to Air Refuelling) capability contributed by the RAF was highly valued,particularly by the
Americans.

VC10s and Tristars flew 355 sorties dispensing nearly 19 million lbs of fuel.
Over 40% of this was given to US Navy and Marine Corps aircraft.*"

*Aircraft of the United States Air Force are unable to receive fuel from the "hose and drogue" equipped British tanker aircraft.


These numbers are almost identical to those given by the United States Air Force.

The Royal Air Force contribution amounted to about 4.5% of the coalition aerial refuelling effort which offloaded a total of 417,137,233 pounds of fuel.

A summary of the relevant figures is as follows:


Number of refuelling aircraft.


                    United States Air Force                          182                   
                        United States Marine Corps                     22                       
                         United States Navy                                   52                        
            Royal Air Force                                        12 (4.5%)

Total                                                         268


Number of Refuelling Sorties Flown.

United States Air Force                        6,193 
United States Marine Corps                    454
 United States Navy                              2,058 
         Royal Air Force                                       359 (4%)

Total                                                     9,064

Pounds of fuel offloaded.
  
United States Air Force        376,391,000 
United States Marine Corps   12,545,786
United States Navy                   9,316,447
            Coalition  (Royal Air Force)     18,884,000 (4.5%)

Total                                         417,137,233


Using the more precise American figures we get a total of 8,584 tonnes of fuel offloaded by British tanker aircraft in 359 sorties during 31 days of combat operations.

An average of 277 tonnes offloaded per day by an average of 11.6 daily tanker sorties.

This is an average of 0.97 sorties per tanker aircraft per day*.

An average of 23.9 tonnes of fuel was offloaded per sortie.

An average of 23.1 tonnes of fuel was offloaded per aircraft per day.

Only 60% of the above was offloaded to British military aircraft.

*This figure is higher than that achieved by Royal Air Force combat aircraft during operation Telic.

The Royal Air Force often generates far lower sortie rates than other air arms and air forces.

However,Royal Air Force tanker aircraft often generate far higher sortie rates than other elements of the Royal Air Force.




Unfortunately none of the above figures gives any indication of where the fuel was offloaded.


For the receiving aircraft,the important metric in aerial refuelling is the weight of fuel received and the distance from the operating area at which it is received.


Fuel received close to the operating area is of more benefit than fuel received far from the combat area.


It is important to note that the range from the tanker aircraft's base is of no relevance at all to this.


This gives us a problem when comparing the performance of aerial refuelling aircraft.


The most obvious and easily compared metric is the fuel the tanker aircraft can offload at a given range from it's base.


But as it is the distance from the combat aircraft's operating area at which the fuel is transferred which is important,this figure is of no benefit.


A smaller tanker aircraft which can generate a large number of daily sorties from an aircraft carrier or shorter runway on a base closer to where the fuel offload is needed may be of more benefit than a large tanker aircraft which can fly fewer sorties from a more distant base with a long runway.


It is essential to consider where the tanker aircraft can operate from and where the fuel offload is needed.


This dictates how far the tanker aircraft must fly on each sortie and thus how many sorties it can generate in a day,how much fuel it will burn on each sortie and how much it will have left to transfer to the receiving aircraft.




For example,an A400M tanker may carry only half as much fuel as an A330 tanker (58 tonnes versus 111 tonnes) but it might be based much closer to it's tanker track as it does not require a 10,000 foot runway.


This reduces fuel burn in transit,and fuel burn on station for the smaller A400M is also less  leaving more fuel for offloading.

With each sortie taking less time,more sorties can be flown in a day,off setting the capacity deficit of the smaller aircraft.

The lower overall fuel consumption also reduces the logistical burden on the ground.


Thus a small carrier based tanker aircraft or a rough field capable tanker convertible A400M might be more cost effective options than a large long runway A330 tanker aircraft - depending on the basing options available.




However,as the A330 tankers are already in production,we shall consider only them here.


During the Iraq invasion,British tanker aircraft (probably 4 Tristars and 8 VC10s) operated from Al Udeid in Qatar,as did most British military aircraft.


Al Udeid is about 400 miles from the border of Iraq.


As orbiting tanker aircraft are highly vulnerable we may assume that the tanker orbits (an image of a tanker orbit can be seen here) were some distance South of the Iraqi border during initial combat operations at least.


They later moved further North as the threat declined later on.


This would place the tanker orbits perhaps about 350 nautical miles North of Al Udeid initially,distances increasing later in the conflict.


An A330 tanker can deliver 60 tonnes of fuel at 500 nautical miles from base with 5 hours on station.


At shorter ranges it can offload far more fuel than that.




The average of 277 tonnes offloaded per day by the Royal Air Force Tristars and VC10s could probably be delivered by about 4 daily A330 tanker sorties.


Assuming the A330 generates the same sortie rates as the Tristars and VC10s managed,we would probably require only 4 A330 tanker aircraft to generate the offload capacity delivered by 12 tanker aircraft in 2003.


Assuming 80% availability of the A330 fleet,we would require a fleet of just 5 A330s to satisfy peak tanker demand during major war fighting operations.


If we were to exclude the 40% of the British tanker capacity which was not offloaded to British aircraft in 2003,the requirement would be for about 2.5 A330 tanker sorties per day.


This could be provided by a total fleet of just 3 A330 tankers.


As we said earlier,future tanker demand is likely to be far lower than it was in 2003,with longer ranged aircraft like F35C replacing the short ranged Harrier and new aircraft carriers usually allowing them to be based closer to the combat area.


Buying tanker conversion kits for A400Ms and F35Cs would reduce demand for dedicated tanker aircraft still further.